Phones answered 24/7Licensed, insured contractors(315) 640-3590
$100 off your first job, credited by us. Terms apply.

Cicero, NY

Stone and Brick Veneer in Cicero

What decides whether veneer lasts in Cicero is the assembly behind it, and it is visible for about a day.

149 daysThe Syracuse window for laying masonry with no cold weather measures
40FWhere the masonry specification changes, and it is not freezing
4 inMinimum compacted base under a patio, and only over well drained soil
Get In Touch

Stone Veneer quote in Cicero

Share a few details so we can confirm coverage and arrange the right next step.

Would you rather talk it through? Call (315) 640-3590, answered 24/7.

$100credit

$100 off your first job

Credited by us on your first booked job.

  • One credit per customer per property, on your first booked job.
  • Valid through December 31, 2026.
Start Your Quote

Mention this offer when you book. Full terms.

Where is the project going in?

Who should we ask for?

How can we reach you?

We call to confirm the details before anyone is sent out.

Where is the property?

The contractor match is by property, not by person, so the street line matters.

Anything else we should know?

Your $100 credit is attached to this request. Mention this offer when you book. See terms.

Your details are used only to respond to this request and arrange the service.

Local Detail

The Cicero record behind this page

Paver patio running up to the rear wall of a newer house with a fresh mulch border

In the Town of Cicero, 59.5 percent of the mapped soil area is classed poorly drained, somewhat poorly drained or very poorly drained, and 6.2 percent is classed well drained. The single largest map unit is Niagara silt loam on 0 to 4 percent slopes at about 28.6 percent of the town, followed by Collamer silt loam at about 12.2 percent and Carlisle muck, a very poorly drained organic soil, at about 12.0 percent.

Source: United States Department of Agriculture, Natural Resources Conservation Service, Soil Survey Geographic Database for Onondaga County New York, survey area NY067, queried through the Soil Data Access service, accessed 2026-09-14

Niagara silt loam, the second most extensive soil in Onondaga County and the dominant soil across the northern towns, carries a seasonal high water table with its top at about 31 centimeters, roughly 12 inches, below the surface, and the county soil data records that condition for December, January, February, March, April and May. Rhinebeck silt loam has the same 31 centimeter figure. Kendaia silt loam is shallower at about 20 centimeters, roughly 8 inches. For comparison, Collamer silt loam is about 54 centimeters, roughly 21 inches, and Honeoye silt loam about 76 centimeters, roughly 30 inches.

Source: United States Department of Agriculture, Natural Resources Conservation Service, Soil Survey Geographic Database for Onondaga County New York, survey area NY067, queried through the Soil Data Access service, accessed 2026-09-14

Both of the fast-growing northern towns name fireplaces on their list of work requiring a building permit and neither names a patio. The Town of Clay lists new buildings, all additions and alterations, mobile homes, garages and barns, pools, sheds and storage buildings, decks and porches, fences, signs, fireplaces, stoves and inserts, and demolition. The Town of Cicero lists decks, porches and garages, fireplaces, pellet stoves and wood stoves, storage sheds no matter the size, fences, swimming pools, and structural, plumbing or electrical alterations, and requires a permit before excavation or filling of more than 10 cubic yards. Cicero also requires a Floodplain Development Permit for any work in a 100 year flood zone, including work that would not otherwise need a permit.

Source: Town of Clay, New York, Department of Planning and Development, Building Permits Information, and Town of Cicero, New York, Department of Zoning and Planning, forms and permits, accessed 2026-09-14

National Flood Insurance Program figures in the county hazard mitigation plan annexes show how differently water behaves across the northern towns. The Town of Cicero has 180 active policies and 153 claims paid totalling about 1.44 million dollars. The Town of Clay has 93 policies and 49 claims paid totalling 455,606 dollars, and no repetitive loss or severe repetitive loss properties. North Syracuse village has 4 policies and has had no claims paid at all, a total of zero dollars. Solvay village has 3 policies and 6 claims paid totalling 10,957 dollars, and East Syracuse village has 9 policies and 12 claims paid totalling 223,722 dollars.

Source: Onondaga County, New York, 2025 Hazard Mitigation Plan, Town of Cicero Annex, Town of Clay Annex and Village of North Syracuse Annex, Onondaga County Department of Planning, accessed 2026-09-14

Ranked by the share of housing units built in 2000 or later, the era in which adhered stone veneer and segmental paver hardscape became the dominant new masonry products, the places of this metro spread very widely. Radisson, the census place inside the Town of Clay, leads at 32.4 percent, followed by the Town of Lysander at 25.8 percent, the Town of Van Buren at 21.9 percent, Baldwinsville village at 20.1 percent, the Town of Cicero at 19.1 percent, the Town of Clay at 15.4 percent, the Town of Camillus at 15.2 percent, the Town of Manlius at 11.6 percent, the Town of Marcellus at 11.3 percent, the Town of Skaneateles at 11.2 percent, Marcellus village at 9.9 percent, the Town of DeWitt at 8.7 percent, Skaneateles village at 8.4 percent, Fayetteville village at 8.1 percent, the Town of Salina at 7.0 percent, the City of Syracuse at 6.4 percent, Camillus village at 6.4 percent, Liverpool village at 6.1 percent, North Syracuse village at 4.7 percent, Manlius village at 4.5 percent, and both East Syracuse village and Solvay village at 0.0 percent. The county figure is 11.6 percent.

Source: US Census Bureau, American Community Survey 2020-2024 5-year estimates, table B25034 Year Structure Built and table B25035 Median Year Structure Built, accessed 2026-09-14

Section R703.12.2 of the Residential Code of New York State, Flashing at Foundation, requires that for adhered masonry veneer on exterior stud walls a corrosion-resistant screed or flashing of a minimum 0.019 inch, or 26 gage, galvanized or plastic, with a minimum vertical attachment flange of 3 1/2 inches, shall be installed to extend a minimum of 1 inch below the foundation plate line.

Source: 2020 Residential Code of New York State, Section R703, Exterior Covering, via UpCodes, accessed 2026-09-14

Section R703.12.3 requires a water-resistive barrier behind adhered masonry veneer and states that the water-resistive barrier shall lap over the exterior of the attachment flange of the screed or flashing provided in accordance with Section R703.12.2. The lap direction is the whole point: the barrier over the flange carries water out of the wall, and the barrier behind the flange carries it in.

Source: 2020 Residential Code of New York State, Section R703, Exterior Covering, via UpCodes, accessed 2026-09-14

Section R703.1.1 of the Residential Code of New York State states the governing principle for every cladding on a frame wall: the exterior wall envelope shall be designed and constructed in a manner that prevents the accumulation of water within the wall assembly by providing a water-resistant barrier behind the exterior cladding as required by Section R703.2, and a means of draining to the exterior water that penetrates the exterior cladding.

Source: 2020 Residential Code of New York State, Section R703, Exterior Covering, via UpCodes, accessed 2026-09-14

The masonry industry's own construction specification sets its cold weather trigger at 40 degrees Fahrenheit, not at freezing. Brick Industry Association Technical Note 1 states that the primary purpose of the cold weather construction procedures is to achieve complete hydration of the cement, which occurs only when material temperatures are 40 degrees Fahrenheit or higher, and that as ambient temperatures fall the chemical reaction slows and may stop completely unless adequate heat is maintained in the mortar or grout. The consequence it names is incomplete cement hydration producing soft, friable mortar with reduced durability.

Source: Brick Industry Association, Technical Note 1, Hot and Cold Weather Construction, accessed 2026-09-14

Local Context

What the wettest ground in this metro means for a veneer wall in Cicero

Cicero's new housing sits on ground that holds water, and that matters to a veneer wall at exactly one place: its bottom edge. The clearance between the last course of stone and the soil or the paving below it is what keeps the wall from wicking, and on a lot where the water table sits a foot down through the winter it is not a detail to shave an inch off to make a course line up.

Cut stone front steps leading up to a covered porch on a modest house
Phones answered 24/7A person picks up, and nobody pushes you toward a date you have not chosen.
Licensed, insured contractorsCarried by the contractor who builds the job, never claimed by us.
No obligation to go aheadAsk what a project involves and take the answer to the quotes you already hold.
Deciding

Deciding on veneer in Cicero

Cicero is the wettest ground we build on. 59.5 percent of the mapped soil in the town is classed poorly, somewhat poorly or very poorly drained, and only 6.2 percent is well drained. The largest single map unit is Niagara silt loam, which carries a seasonal high water table about 12 inches down from December through May.

  1. The month decides the specification

    Mortar reaches full strength only at 40F or above, so a veneer job that runs past early October is one where the setting bed and the scratch coat need heat and cover rather than optimism.

  2. What is behind and beneath the work

    The stone is not what keeps water out of a veneer wall. The barrier, the lath, the flashing and the weep screed at the base do that, with the barrier lapping over the screed's flange so water leaving the assembly is carried out rather than back in.

  3. What to ask whoever quotes

    Ask to see the base of the wall before the stone goes on. The screed and the lap direction are visible for about a day, and invisible for the next thirty years.

How stone veneer works →

Next Step

Tell us what you want built in Cicero

Describe the project and the month you had in mind, and we will tell you what the specification actually needs.

Questions

Stone veneer questions from Cicero

Is Cicero ground a problem for stone veneer?

The Town of Cicero lists fireplaces among the work needing a building permit and does not list a patio at grade. For a veneer job the practical consequence is that the wall has to be able to dry outward and discharge at its base, whatever the ground in front of it is doing.

How can I tell the wall behind my veneer was detailed properly?

Look at the bottom edge from your own driveway, which costs nothing. A metal screed should run along the base of the stonework with a gap under its lip so water can leave, and the barrier above should lap over that flange rather than tuck behind it. The stone should also hold a clearance above soil or paving. If the last course disappears into mulch or blacktop, whatever gets behind that wall has no way out.

Next Step

Get a Cicero quote you can read

Send the details and we will connect you with licensed, insured contractors who put the base, the drainage and the dates in writing.

Start Your QuoteCall (315) 640-3590
Start Your Quote